New Port Project (NPP) Doha: the ‘Mozes’ project
Dry excavation of the NDPP access channel over a length of 3,000 m and a width of 400 m.
Customer
MEDCO
MEDCO
Delivery date
01 January 2015
01 January 2015
Services by AGT
The largest dewatering in the world!
The access channel towards the New Doha Port and the Marine Basis have been excavated in dry conditions till a level of -18 masl, and quay walls are built in dry conditions at a level of -21 masl. AGT, in close cooperation with Medco, executed the on-and offshore investigation fieldwork, and made the dewatering design. The dewatering has been executed very successfully. The access channel, over a length of 3 km and a width of 400 meter has been executed in dry conditions.