New Port Project (NPP) Doha: the ‘Mozes’ project

Doha, Qatar - Field measurements, Numerical groundwater modelling

Dry excavation of the NDPP access channel over a length of 3,000 m and a width of 400 m.



New Port Project (NPP) Doha: the ‘Mozes’ project
Customer
MEDCO
Delivery date
01 January 2015
Project manager
Jos Van Steenwinkel
New Port Project (NPP): the ‘Mozes’ project

The largest dewatering in the world!

The access channel towards the New Doha Port and the Marine Basis have been excavated in dry conditions till a level of -18 masl, and quay walls are built in dry conditions at a level of -21 masl. AGT, in close cooperation with Medco, executed the on-and offshore investigation fieldwork, and made the dewatering design. The dewatering has been executed very successfully. The access channel, over a length of 3 km and a width of 400 meter has been executed in dry conditions.

New Port Project (NPP): the ‘Mozes’ project
New Port Project (NPP): the ‘Mozes’ project